The work order for this request was submitted today (WO: 1090374). Below highlights what signage and marking addition are planned in response to the TSI:
INSTALL PAVEMENT MARKINGS:
• (2) 20’ Double Yellow centerline stubs on Rittenhouse Street NW
• (5) White flexible bollards on the stripped-out parking box on NB 3rd Street NW
INSTALL SIGNS:
• (1) NO STANDING OR PARKING ANYTIME (right arrow) sign on WB Rittenhouse Street NW
• (1) NO STANDING OR PARKING ANYTIME (left arrow) sign on EB Rittenhouse Street NW
• (1) NO STANDING OR PARKING ANYTIME (double arrow) sign EB Rittenhouse Street NW
• (4) Pedestrian warning signs (fluorescent yellow-green) on NB and SB 3rd Street NW
• (2) Downward right arrow plaques below ped warning signs on NB and SB 3rd Street NW
• (2) Downward left arrow plaques below ped warning signs on NB and SB 3rd Street NW
• (2) STOP FOR PEDESTRIANS WITHIN CROSSWALK pylons on NB and SB 3rd Street NW