As you may know, there are now two different "Emergency No Parking" signs along 3rd Street from Madison Street to Oglethorpe Street NW. Despite the duplicitous signage, it doesn't appear that any work has commenced.
According to PaveDC the following is planned:
Street 3RD ST NW
From MADISON ST NW & Alley-47045872
To OGLETHORPE ST NW
Status Planned
Miles 0.20
Type Collector
Side Both Side
Ward 4
ANC 4B
Madison Street from 2nd Place to 3rd Street has been completed:
Street MADISON ST NW
From 2ND PL NW
To 3RD ST NW
Status Completed
Miles 0.05
Type Minor Arterial
Side Both Side
Ward 4
ANC 4B
Nicholson Street between Blair Rd NW and 1st St NW is planned:
Street NICHOLSON ST NW
From BLAIR RD NW
To 1ST ST NW
Status Planned
Miles 0.13
Type Minor Arterial
Side Both Side
Ward 4
ANC 4B
I am in communication with DDOT to determine what is going on, and where the breakdown in communication occurred and ameliorate as expeditiously as possible.
I do apologize for the inconvenience. I will post follow-up comments as soon as any additional information becomes available.
Good evening all, I heard back from DDOT and they stated the following: 1. The contractor rescheduled the concrete work on 3rd St NW for next week. All ENP signs are being removed and will be re-posted 72 hours before work. 2. Please note that the 5700 and 5800 blocks of 3rd St NW are actually part of the paving plan for 2023, and we are currently updating the PaveDC website to show this section. This repaving was initially submitted as a request in 2019 when I was first elected as ANC Commissioner for 4B06 so it is a long time coming. As I learn more, I will keep the community updated.